Boating New Zealand Boat Reviews
Reviews
Boating New Zealand News
News
Boating New Zealand Sports
Sport
Boating New Zealand Lifestyle
Lifestyle
advertise
Boating New Zealand Boat Reviews
Reviews
Boating New Zealand News
News
Boating New Zealand Sports
Sport
Boating New Zealand Lifestyle
Lifestyle
BOAT-REVIEWS-MOBILE
Boat Reviews
BOAT-NEWS-MOBILE
News
BOAT-SPORTS-MOBILE
Sports
BOAT-LIFESTYLE-MOBILE
Lifestyle
HomeMagazineBoat BriefMarina construction challenges

Marina construction challenges

Published
Bookmark post
Bookmarked
Bookmark post
Bookmarked

Marina expansions, while exciting for berth holders, often come with challenges.

The Fairway Bay Marina expansion, managed and constructed by Bellingham Marine, faced several obstacles. One of the most significant was the task of removing old piles from limestone bedrock and placing new piles into the marina floor, which consisted of a solid base akin to low-strength concrete.

Fairway Bay Marina undertook the marina expansion project that commenced work in June 2022 and successfully concluded on schedule in December last year. This expansion aimed to elevate the marina’s facilities and address the increasing demand for berths, especially within the larger 20 and 18-metre catamaran market. Situated at the end of the Whangaparaoa Peninsula, the marina enjoys a prime location with direct access to our world-class Hauraki Gulf.

- Advertisement, article continues below -
Tauranga Boat Sales
Mustang 2800 (2005)
Mustang 2800 (2005)
$70,000
9m | Here is a tidy Mustang 2800 with a rebuilt engine making for a great value boat with lots to offer
Craig de Wet, Bellingham’s Senior Project Manager.

THE LIMESTONE BEDROCK CHALLENGE

One of the most significant challenges encountered was the need to not only remove old piles but also secure piles into the unforgiving limestone bedrock. Removing the old steel piles effectively cemented into the marina floor required high-capacity vibration equipment, and placing the new piles required drilling 400mm diameter pile sockets into layers of limestone that were rock-hard, which posed considerable difficulty.

Craig de Wet, Bellingham’s Senior Project Manager, recalls the lessons learned from a previous project at Gulf Harbour Marina. “We learnt from drilling the pile sockets for T Pier meant we had to find another way,” says Craig. The issue revolved around the socket spoils fouling the auger, leading to hours of constant cleaning and slow progress.

To address this challenge, the project team modified the drilling auger to direct a flow of compressed air down through the auger centre during operation. This effectively flushed out the excavated material as the socket was being drilled, greatly enhancing the efficiency of the drilling process.

Before and after

RE-PURPOSING OLD MATERIALS

- Advertisement, article continues below -
Riviera Australia

Sustainability played a pivotal role in the expansion project. Instead of disposing of old pontoons and piles, one-third of the existing marina was repurposed into the new expansion. This approach not only reduced cost but also reduced the environmental impact. Industry standard marina pontoons are made up of a polystyrene core encased in concrete and both materials are challenging to dispose of or recycle. The project therefore accommodated the existing marina structures seamlessly into the new expansion.

The Fairway Bay Marina expansion, despite its challenges, stands as a testament to innovation, efficiency, and sustainability. It pays tribute to the dedication and problem solving spirit that drives marina construction in challenging environments. BNZ

SHARE:

Article
Article

Amphibious freedom for any boat

Boat Brief
The latest innovation from Tectrax is a game-changer: an autonomous, amphibious trailer system.
Article
Article

Galvanic corrosion

Boat Brief
Galvanic corrosion is a flow of electric current between dissimilar metals in an electrolyte such as...
Article
Article

Floating shed causes a stir in Whangamata harbour

Boat Brief
Locals in Whangamata woke to an unusual sight this morning – a corrugated iron shed adrift in the ha...

Comments

This conversation is moderated by Boating New Zealand. Subscribe to view comments and join the conversation. Choose your plan →

This conversation is moderated by Boating New Zealand.

Boating New Zealand
Boating New Zealandhttps://www.boatingnz.co.nz
Boating NZ is New Zealand’s premier marine title devoted to putting its readers behind the wheel of the latest trailerboats, yachts and launches to hit the market. It inspires with practical content and cruising adventures, leads the fleet with its racing coverage and is on the pulse of the latest maritime news and innovation.

Pacific Rim Marine Surveys Ltd

Being both a boat builder and sailor gives Marine Surveyor James Newcombe a distinct advantage when it comes to understanding what to look for when conducting Pre Purchase Inspections, Surveys and Pr...
Dixon Stainless logo

Dixon Stainless

A Breakthrough in Custom Stanchions At the forefront of Dixon Stainless’ offerings is their ability to produce custom stanchions, a significant milestone for New Zealand’s marine industry. These stanchions—essential vertical supports on boats that hold life-lines in place around the hull—are vital for safety in marine and yachting applications. In river rafting, similar metal bars securely hold the yokes for oars, making them a crucial element for both safety and functionality. Dixon Stainle...

LATEST NEWS

1949 Curnow & Wilton trawler

A classic 13-metre timber trawler, Santa Maria blends rugged heritage with cosy liveaboard comfort—ready for her next adventure.

Riviera 4600 SY

This vessel epitomises elegance with its sleek lines and contemporary design, offering a seamless fusion of indoor and outdoor living in a spacious, open-plan layout.